MDAs

Ministries, Departments & Agencies

©2023 Edo State Government

EDO FEWMA|

To solve the flooded problem a major drainage system was designed for a fifty year return period of rainfall event.

The Urora site is located approximately 10km to the North east of centre of Benin city-Ehor, Ekpoma and Auchi road. The flood problem in Urora can be traced to the fact that the area has a very flat topography, and the presence of low-lying areas with absence of storm water drainage, thus leaving portions of the area frequently flooded.

To solve the flooded problem a major drainage system was designed for a fifty year return period of rainfall event. To reduce peak floors attenuation ponds were provided, with each pond connected to each other via underground culverts of various dimensions.

Comments are closed.